Hawkins

Hawkins

Hawkins Gold Project

Hearst, Ontario (Archean-aged Kabinakagami  Lake greenstone belt)

Highlights

  • Large, approximately 26,000-hectare land package located in a prolific gold mining region of Ontario, covering a significant portion of the underexplored Kabinakagami Lake greenstone belt.
  • Current NI 43-101 Inferred Mineral Resource of 440,400 oz Au (14.0 Mt at 0.98 g/t Au) at the McKinnon Deposit
  • District-scale gold potentialalong the approximately 60 km Puskuta Deformation Zone, including a currently identified 15 km mineralized corridor
  • High-grade gold mineralization confirmed beyond McKinnon, including 9.42 g/t Au over 11.0 m in 2026 channel sampling at Goldfields
  • Significant exploration and resource expansion potential, with the McKinnon Deposit open along strike and at depth and much of the broader structural corridor untested by modern exploration
  • Year-round road and rail access, with an approved Early Exploration Permit supporting advancement of priority drill targets

Mineral Resource Estimate - NI 43-101

McKinnon Deposit, Hawkins Gold Project Inferred Mineral Resource Estimate – Effective Date of September 11, 2026

Mineral Resource Type

Cut-off
(Au g/t)

Tonnes
 (k)

Au Grade
 (g/t)

Contained Au (koz)

Pit-Constrained

0.24

12,645

0.89

360.0

Out-of-Pit (Underground)

1.2

1,371

1.82

80.4

Total Inferred Mineral Resource

14,016

0.98

440.4

Notes:

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

The Mineral Resource Estimate was prepared in accordance with the CIM Definition Standards on Mineral Resources and Mineral Reserves (May 2014) and the CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines (November 2019), as required by NI 43-101.

The entire Mineral Resource is classified as Inferred. An Inferred Mineral Resource carries a lower level of confidence than an Indicated Mineral Resource, is based on limited geological evidence and sampling sufficient only to imply but not verify grade and grade continuity and must not be converted to a Mineral Reserve. Confidence in the estimate of Inferred Mineral Resources is insufficient to allow the meaningful application of technical and economic parameters, or to enable an evaluation of economic viability worthy of public disclosure. There is no certainty that any part of the Inferred Mineral Resource will be upgraded to a higher confidence category with further exploration. It is reasonably expected the majority of Inferred Resources could be upgraded to higher resource categories with continued exploration and drilling.

Metal price and process assumptions: US$3,500/oz Au, 0.72 CDN$/US$ FX, process recovery of 93% Au, process cost of CDN$27/t, and G&A of CDN$8/t.

The assumed gold process recovery is supported by whole-cyanidation metallurgical test work commissioned by Falconbridge Limited at Lakefield Research in 1985 on seven samples of Project mineralization, which returned gold recoveries ranging from 82.3% to 98.0% and averaging 92.2%. No modern metallurgical test work has been completed on Project material.

MRE constraining parameters: pit optimization used mining costs of CDN$3.50/t mineralized material, CDN$3.25/t waste and CDN$2.75/t overburden with 50-degree pit slopes at a 0.24 g/t Au cut-off. Out-of-pit blocks were reported above a 1.2 g/t Au cut-off at a mining cost of CDN$140/t, below the constraining pit shell and within the constraining mineralized wireframes, and exhibit continuity and reasonable prospects for eventual economic extraction using long-hole underground mining methods.

A bulk density of 2.70 t/m³ was applied to all waste and mineralized blocks. Overburden was assigned a bulk density of 1.8 t/m³.

Tonnes, grades and contained ounces are rounded to reflect estimation precision; totals may not sum exactly and contained ounces may not reconcile exactly against rounded tonnes and grades. Contained gold ounces are in situ and make no allowance for processing losses.

The QPs are not aware of any known environmental, permitting, legal, title, taxation, socio-economic, marketing, political or other relevant factors that could materially affect the MRE.

2026 Exploration Results

The 2026 surface exploration program confirmed high-grade gold mineralization at multiple prospects beyond the McKinnon Deposit, reinforcing the potential for additional mineralized zones across the broader Hawkins property.

  • Goldfields: Channel sampling returned 9.42 g/t Au over 11.0 m, including individual 1.0 m intervals grading 32.5 g/t Au and 64.7 g/t Au.
  • Hawkins East Corridor: Selective grab samples returned up to 72.1 g/t Au and 65.0 g/t Au.
  • Debroy–Seaview: An approximately 2.35 km historically untested trend was identified for follow-up exploration.

These results provide additional targets for follow-up exploration outside the existing McKinnon resource area.

True widths of channel samples are currently unknown. Selective grab samples are not necessarily representative of average mineralization grade or continuity.

Geology, Geophysics & Targeting

  • Hawkins is situated within the Archean Kabinakagami Lake greenstone belt, where gold mineralization is associated with the regionally extensive, east–west-trending Puskuta Deformation Zone.
  • The approximately 60 km deformation system includes a currently identified 15 km mineralized corridor extending beyond the McKinnon Deposit.
  • The Company’s evolving geological interpretation suggests that gold mineralization may be influenced by the interaction of the main deformation corridor, subsidiary shear zones, favourable lithological contacts and cross-cutting structures.
  • Geological mapping and magnetic geophysical interpretation have identified additional subparallel trends, including an interpreted tonalite-hosted magnetic-low corridor and prospective volcanic–intrusive contacts.
  • Several interpreted north-northwest-trending structures intersect the dominant east–west geological fabric, potentially creating favourable settings for localized deformation, hydrothermal fluid flow and gold deposition.
  • The Company is integrating historical drilling, geological mapping, geophysical surveys and 2026 exploration results to identify areas where these favourable .
  • geological conditions coincide and prioritize additional drill targets beyond the existing McKinnon Deposit.

Planned Work

Epic Gold’s exploration strategy is focused on evaluating opportunities to expand the existing McKinnon resource while systematically advancing new gold targets across the broader property.

Priority Activities include:

  • Refining geological and structural interpretations using historical drilling, geophysical datasets and 2026 field results.
  • Advancing Goldfields, Debroy–Seaview and other prospective structural and lithological targets toward drill testing.
  • Evaluating opportunities to extend known mineralization at McKinnon along strike and at depth.
  • Expanding detailed geophysical surveys and prospecting to the eastern limits of the property along an additional approximately 40km of the Puskuta Deformation Zone to identify additional prospective targets
  • Prioritizing drill targets based on geological continuity, structural setting, surface mineralization and geophysical signatures.

Qualified Person

The scientific and technical information has been reviewed and approved by Mark Richardson, P.Geo. (OGQ Permit No. 10929), a Qualified Person as defined by National Instrument 43-101.